×
accessibility
Accessibility Tools

Thermal

250 MW Surat Lignite Power Plant Phase-II

image
image
 

SLPP-II is an Expansion Power Plant comprises of 125 MW Units-3 & 4. The Project is executed by BHEL under EPC Mode. It entered into commercial operation in April, 2010 as an Independent Power Producer (IPP) and power off-take is tied up with GUVNL through a 30-year Long Term PPA.

The Power Plant is equipped with environment friendly CFBC Boilers and the Plant emissions comply with the stringent Revised Emission Rules,2015 with minimal upgrade.

Lignite and Limestone requirement is met by the captive Mangrol- Valia and Vastan Mines.

This Plant is located at Village Nani Naroli, Taluka Mangrol, Dist. Surat, Gujarat State.

250 MW Surat Lignite Power Plant Phase-I

image
image
 

SLPP-I was set up as a green field project and entered into commercial operation in February, 2000 as an Independent Power Producer. It comprises of 125 MW Units-1 & 2 and Main Plant Equipment is supplied by BHEL. Power off-take is tied up with GUVNL through a 30-year Long-Term PPA.

The Power Plant is equipped with environment friendly CFBC Boilers and the Plant emissions comply with the stringent Revised Emission Rules,2015 with minimal upgrade.

Lignite and Limestone requirement is met by the captive Mangrol- Valia and Vastan Mines.

This Plant is located at Village Nani Naroli, Taluka Mangrol, Dist. Surat, Gujarat State.

165 MW Combined Cycle Power Plant

image
image

The 165 MW Combined Cycle Power Plant entered into commercial operation as an Independent Power Producer (IPP) in February, 1998. Main Plant equipment is of BHEL make. This Plant supplied power to GUVNL under a Long Term PPA, which expired in 2016. Thereafter, it supplies power to GUVNL on “As and When Required Basis” under 5 years PPA valid till March,2024.

The power plant comprises of 1 x 111 MW Frame-9 Gas Turbine Generators and a 54 MW Steam Turbine Generator of BHEL make.

145 MW Combined Cycle Power Plant

image
image

GIPCL began its illustrious journey with the setting up of the 145 MW Combined Cycle Power Plant in Vadodara as a unique concept in the Electricity Sector in the pre-reform era. State Sector Enterprises Gujarat State Fertilizers and Chemicals Ltd. (GSFC), Gujarat Alkalies and Chemicals Ltd. (GACL), Petrofils Co-operative Ltd. and the State Power Utility Gujarat Urja Vikas Nigam Ltd.(GUVNL), erstwhile Gujarat Electricity Board) came together to set up this power plant to meet the energy requirement of Participating Units. It commenced commercial operation in March, 1992 and power off-take was governed by a Memorandum of Understanding between GIPCL and beneficiaries/promoters. This Power Plant operated uninterruptedly till November, 2021. The Plant had to stop operations due to huge surge in gas price and since then it is kept under preservation.

The power plant comprises of 3 x 32 MW Frame-6 Gas Turbine Generators and a 49 MW Steam Turbine Generator of BHEL make.

This Plant is under preservation from November, 2021 in view of the prevailing high gas price scenario.

menu itens