×
accessibility
Accessibility Tools
image

Vastan Lignite Mine

Vastan Lignite Mine, a project of GIPCL covers a mining lease area of 1536 Ha and lies between Latitude 21°22’27” to 21°26’42” and Longitude 73°5’13” to 73°8’47”. The mining area falls in Mangrol Taluka of Surat District. It is approx. 50 Km. away from Surat and 40 Km. from Ankleshwar (Dist. Bharuch). The site can be approached from N.H. 8 connecting Bombay-Ahmedabad via Kim

Vastan Lignite Mine is divided in two pits namely Vastan North Pit and Vastan South Pit. Vastan North Pit is already exhausted in the year June, 2012 and presently GIPCL is operating Vastan Lignite Mine-South Pit.

Vastan Lignite Mine has received National Safety Awards for the years 2004, 2005, 2011, 2012, 2013, 2014 and 2017, in Lowest Injury Frequency Rate (LIFR) Per Million Cubic Meter of Output.

Lignite Reserves
Mining Lease Area 1536 Hectare
Approved Mine Capacity 1.2 MTPA
Mineable Reserve of Lignite (MTe) 36.00
Average Stripping Ratio 1:10.5
Commencement of Mining Operations 31st July 1996

Vastan Lignite Mine - Status of Environment Compliance

Environment Clearance

Sr.NoDetailsDownload
1Env. Cleanrance Vastan by MOEF 19.06.96Image   (1.13MB)

Compliance of EC

Sr.NoDetailsDownload
1Half yearly EC compliance report Jul 2021-Dec 2021Image   (5.66MB)
2Half yearly EC compliance report Jan 2021-Jun 2021Image   (6.02MB)
3Half yearly EC compliance report Jul 2020-Dec 2020Image   (5.29MB)
4Half yearly EC compliance report Jan 2020-Jun 2020Image   (6.02MB)
5Half yearly EC compliance report Jul 2019-Dec 2019Image   (5.55MB)
6Half yearly EC compliance report Jan 2019-Jun 2019Image   (6.30MB)
7Half yearly EC compliance report July 2018-Dec 2018Image   (1.20MB)
8Half yearly EC compliance report Jan 2018-Jun 2018Image   (4.99MB)
9Half yearly EC compliance report July 2017-Dec 2017Image   (696.41KB)
10Half yearly EC compliance report Jan 2017-Jun 2017Image   (718.37KB)

Environment Monitoring Report

Sr.NoDetailsDownload
1Six monthly report of Vastan Lignite mines Jul 2021 - Dec 2021Image   (4.57MB)
2Six monthly report of Vastan Lignite mines Jan 2021 - Jun 2021Image   (4.88MB)
3Six monthly report of Vastan Lignite mines Jul 2020 - Dec 2020Image   (1.34MB)
4Six monthly report of Vastan Lignite mines Jan 2020 - Jun 2020Image   (1.75MB)
5Six monthly report of Vastan Lignite mines Jul 2019 - Dec 2019Image   (5.55MB)
6Six monthly report of Vastan Lignite mines Jan 2019 - Jun 2019Image   (176.29KB)
7Six monthly report of Vastan Lignite mines July 2018 - Dec 2018Image   (6.36MB)
8Six monthly report of Vastan Lignite mines Jan 2018 - June 2018Image   (832.89KB)
9Six monthly report of Vastan Lignite mines July 2017 - Dec 2017Image   (2.90MB)
10Six monthly report of Vastan Lignite mines Jan 2017 - June 2017Image   (1.76MB)

Environment Statement

Sr.NoDetailsDownload
1Form V Environment Statement Vastan Lignite Mine 2019-20Image   (2.29MB)
2Form IV Environment Statement Vastan Lignite Mine 2019-20Image   (5.23MB)
3Form V Environment Statement Vastan Lignite Mine 2018-19Image   (678.94KB)
4Form IV Environment Statement Vastan Lignite Mine 2018-19Image   (1.52MB)
5Form V Environment Statement Vastan Lignite Mine 2017-18Image   (265.54KB)
6Form IV Environment Statement Vastan Lignite Mine 2017-18Image   (266.13KB)

Vastan Limestone Mine

Vastan Limestone Mine, a project of GIPCL covers a mining lease area of 80.00 Ha out of 1536 Hectare of Vastan Lignite Mine. It contains Low Grade Limestone deposits as Overburden (overlaying layer) of lignite deposits.

Vastan Limestone Mine lies between Latitude 21° 22' 57" to 21° 24' 41" and Longitude 73° 05' 26" to 73° 06' 22". The mining area falls in Mangrol Taluka of Surat District. It is approx. 50 Km. away from Surat and 40 Km. from Ankleshwar (Dist. Bharuch). The site can be approached from N.H. 8 connecting Bombay-Ahmedabad via Kim.

To use this Low grade Limestone for controlling Sulphur Dioxide (SO2) emission in the Power Plant, GIPCL was granted approval for inclusion of mineral Limestone in the existing Mining Lease of Lignite, by the Ministry of Steel & Mines, Govt. of India, vide letter no. 4/65/98.M IV dated 08-09-1998.

Limestone Reserves
Mining Lease Area 80.00 Hectare.
Approved Mine Capacity 4.25 Lakh Te Per Annum (ROM)
Mineable Reserve of Lignite (MTe) 12.00
Commencement of Mining Operations 1st Jan, 2000

Vastan Limestone Mine - Status of Environment Compliance

Environment Clearance

Sr.NoDetailsDownload
1EC of Vastan Limestone MineImage   (4.84MB)

Compliance of EC

Sr.NoDetailsDownload
1Half yearly EC Compliance Report July 2021 - Dec 2021Image   (7.85MB)
2Half yearly EC Compliance Report Jan 2020 - Jun 2020Image   (13.88MB)
3Half yearly EC Compliance Report Jul 2019 - Dec 2019Image   (12.20MB)
4Half yearly EC Compliance Report Jan 2019 - Jun 2019Image   (13.93MB)

Environment Monitoring Report

Sr.NoDetailsDownload
1Six Monthly Report of Vastan Lime Stone Mines July 2021 - Dec 2021Image   (4.40MB)
2Six Monthly Report of Vastan Lime Stone Mines Jan 2020 - Jun 2020Image   (1.53MB)
3Six Monthly Report of Vastan Lime Stone Mines Jul 2019 - Dec 2019Image   (1.62MB)
4Six Monthly Report of Vastan Lime Stone Mines Jan 2019 - June 2019)Image   (6.97MB)
menu itens