Plant Performance

Plant Performance

Plant Performance

145 MW CCPP GIPCL-1

Parameter Unit Q4 20-21 FY 20-21 FY 19-20 FY 18-19 FY 17-18
 Generation  MUs  131.93 713.94 699.99 698.4 676.21
 PLF  42.12 56.21 54.96 54.98 53.24

165 MW CCPP GIPCL-2

Parameter Unit  Q4 20-21 FY 20-21 FY 19-20 FY 18-19 FY 17-18
Generation MUs  0.00 16.92 12.57 0 35.56
PLF 0.00 1.44 2.65 0 2.46

250 MW SLPP-I

Parameter Unit Q4 20-21 FY 20-21 FY 19-20 FY 18-19 FY 17-18
Generation MUs 211.08 1322.73 1614.52 1706.99 1589.34
PLF % 39.09 60.40 73.52 77.94 72.57

250 MW SLPP-II

Parameter Unit Q4 20-21 FY 20-21 FY 19-20 FY 18-19 FY 17-18
Generation MUs 420.69 1652.93 1754.24 1814.73 1682.37
PLF % 77.91 75.48 79.47 82.86 76.82

Solar

Parameter Unit Q4 20-21 FY 20-21 FY 19-20 FY 18-19 FY 17-18
Installed Capacity MW 162.00 162.00 162 87 87
Net Energy Injected into Grid MUs 86.05 317.26 273.40 163.88 81.25
CUF % 24.59 22.36 19.89 21.45 18.32

Wind

Parameter Unit Q4 20-21 FY 20-21 FY 19-20 FY 18-19 FY 17-18
Installed Capacity MW 112.40 112.40 112.4 112.4 112.4
Net Energy Injected into Grid MUs  46.40 208.22 252.51 252.31 243.02
CUF 19.11 21.15 25.57 25.63 24.68
Back to Top