Plant Performance

Plant Performance

Plant Performance

145 MW CCPP GIPCL-1

Parameter Unit Q2 20-21 FY 20-21 FY 19-20 FY 18-19 FY 17-18
 Generation  MUs  201.17 387.23 699.99 698.4 676.21
 PLF  62.84 60.80 54.96 54.98 53.24

165 MW CCPP GIPCL-2

Parameter Unit  Q2 20-21 FY 20-21 FY 19-20 FY 18-19 FY 17-18
Generation MUs  7.96 16.11 12.57 0 35.56
PLF 2.77 2.82 2.65 0 2.46

250 MW SLPP-I

Parameter Unit Q2 20-21 FY 20-21 FY 19-20 FY 18-19 FY 17-18
Generation MUs 319.68 741.66 1614.52 1706.99 1589.34
PLF % 57.91 67.55 73.52 77.94 72.57

250 MW SLPP-II

Parameter Unit Q2 20-21 FY 20-21 FY 19-20 FY 18-19 FY 17-18
Generation MUs 374.10 820.32 1754.24 1814.73 1682.37
PLF % 67.77 74.71 79.47 82.86 76.82

Solar

Parameter Unit Q2 20-21 FY 20-21 FY 19-20 FY 18-19 FY 17-18
Installed Capacity MW 162.00 162.00 162 87 87
Net Energy Injected into Grid MUs 63.14 151.38 273.40 163.88 81.25
CUF % 17.65 21.28 19.89 21.45 18.32

Wind

Parameter Unit Q2 20-21 FY 20-21 FY 19-20 FY 18-19 FY 17-18
Installed Capacity MW 112.40 112.40 112.4 112.4 112.4
Net Energy Injected into Grid MUs  58.87 115.05 252.51 252.31 243.02
CUF 23.72 23.30 25.57 25.63 24.68