Plant Performance

Prizes won by GIPCL Mining Department during the 25th Mines Environment & Mineral Conservation Week 2017-18

Vadodara Station-I : 145 MW GAS BASED POWER PLANT

Particulars Units Financial Year
2017-18 2018-19
Availability Factor % 92.81 94.26
PLF % 53.24 54.98
Generation MU 676.21 698.40

VADODARA STATION-II : 165 MW GAS BASED POWER PLANT

Particulars Units Financial Year
2017-18(19.9.2017 to 28.02.2018)  2018-19
Declared Capacity % 58.01 -
PLF % 5.51 -
Generation MU 33.561 -

SLPP - 4 X 125 MW Lignite Based Power Plant

Particulars Units Financial Year
2017-18 2018-19
Availability Factor % 84.32 86.28
PLF % 74.70 80.40
Generation MU 3271.715 3521.714

PERFORMANCE OF WIND POWER ASSETS

Grid Connected Wind Power Project Financial Year
FY:2017-18 FY:2018-19
Installed Capacity(MW) 112.4 112.4
Net Energy Injected into Grid (MUs) 243.02 252.31

PERFORMANCE OF GRID CONNECTED SOLAR PV ASSETS

Grid Connected Solar PV Power Project Financial Year
FY:2017-18 FY:2018-19
Installed Capacity(MW) 87 87
Net Energy Injected into Grid (MUs) 81.25 163.61