Plant Performance

Plant Performance

Plant Performance

145 MW CCPP GIPCL-1

Parameter Unit Q1 20-21 FY 19-20 FY 18-19 FY 17-18
 Generation  MUs  186.05 699.99 698.4 676.21
 PLF  58.75% 54.96 54.98 53.24

165 MW CCPP GIPCL-2

Parameter Unit  Q1 20-21 FY 19-20 FY 18-19 FY 17-18
Generation MUs  8.142 12.57 0 35.56
PLF 2.78% 2.65 0 2.46

250 MW SLPP-I

Parameter Unit Q1 20-21 FY 19-20 FY 18-19 FY 17-18
Generation MUs 421.99 1614.52 1706.99 1589.34
PLF % 77.29% 73.52 77.94 72.57

250 MW SLPP-II

Parameter Unit Q1 20-21 FY 19-20 FY 18-19 FY 17-18
Generation MUs 446.22 1754.24 1814.73 1682.37
PLF % 81.73% 79.47 82.86 76.82

Solar

Parameter Unit Q1 20-21 FY 19-20 FY 18-19 FY 17-18
Installed Capacity MW 162.00 162 87 87
Net Energy Injected into Grid MUs 88.23 273.40 163.88 81.25
CUF % 24.94% 19.89 21.45 18.32

Wind

Parameter Unit Q1 20-21 FY 19-20 FY 18-19 FY 17-18
Installed Capacity MW 112.40 112.4 112.4 112.4
Net Energy Injected into Grid MUs  56.17 252.51 252.31 243.02
CUF 22.88 25.57 25.63 24.68
Back to Top